A planned shutdown of the Western Springs Tramway is scheduled for 11-15 August. This is so the final remediation of track can be done following the tramway upgrade.
The Pumphouse will be static displays only with no boiler operating 20-24 August.
The Waitakere Station model railway is closed for maintenance